AGM
All studies

Bathroom

Main bath, tile and valve

A study of a full bath where the tile comes off and the valve is replaced while the walls are open.

  1. 1The pan is tested before the first tile is set.
  2. 2A new valve needs access. The wall that hides it is not the wall that gets a niche by accident.
  3. 3Ventilation is checked against the new shower volume, not the old fan.

A room study. Not a record of a specific client project.